Work notifications

E207: Zoology Annexe

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

E208: Zoology Annexe - Goods Store

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

E209: Marples Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Sprinkler System Isolation

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E209) - Marples Building, 340 Great King Street
(E212) - Benham Building, 346 Great King Street
(E213) - Parker Building, 344 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage:Sprinkler System Isolation

Audience: All Building Users

Description:
Contractors will be moving & altering the sprinkler system valve set to enable the demolition of the Zoology Annexe.
This work is programmed for the week of 28th September to 2nd October 2026 & will involve the isolation of the sprinkler system for the duration of the work.
The isolation will affect the sprinkler systems in E209 - Marples, E212 - Benham & E213 - Parker buildings.
During the isolation these building's sprinkler systems will be inopperative & will not signal a fire to the Fire Service.
The Fire Alarm system (alerting devices, manual call points with smoke & heat detectors) will remain fully operational & will signal the presence of a fire to the Fire Service.
If a fire is discovered, please use the nearest Manual Call Point & follow normal evacuation procedures.
No 'Hot Works' are to be undertaken during the period of the sprinkler isolation unless for emergency reasons & with the appropriate safety measures in place.
To enquire about this essentail work, please contact the undersigned.

Contact:
Craig Connor
Senior Compliance Technician
Property & Campus Development Division
Cellphone: 027 286 1446
Email: craig.connor@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Contractors will be undertaking Gutter cleaning on the Marples building on the 2 October.

02 Oct 2026 07:00 - 02 Oct 2026 17:00

(E209) - Marples Building, 340 Great King Street

Timeframe: 02-10-2026 07:00 to 02-10-2026 17:00

Scheduled Outage:

Audience:

Description:Contractors will be undertaking Gutter cleaning on the Marples building on the 2 October. they will be using a crane parked on the south side of the building to access the roof areas works will begin at 7am and continue until complete.
all emergency egress points will be available.
A ground safety crew and cones and barriers will be in place.


Contact:
Jeff Burrow
Team Leader Plumbing and Gas
Property Services Division
Phone: 556 5208
Cellphone: +6421 279 0353
Email: jeff.burrow@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

E212: Benham Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Sprinkler System Isolation

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E209) - Marples Building, 340 Great King Street
(E212) - Benham Building, 346 Great King Street
(E213) - Parker Building, 344 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage:Sprinkler System Isolation

Audience: All Building Users

Description:
Contractors will be moving & altering the sprinkler system valve set to enable the demolition of the Zoology Annexe.
This work is programmed for the week of 28th September to 2nd October 2026 & will involve the isolation of the sprinkler system for the duration of the work.
The isolation will affect the sprinkler systems in E209 - Marples, E212 - Benham & E213 - Parker buildings.
During the isolation these building's sprinkler systems will be inopperative & will not signal a fire to the Fire Service.
The Fire Alarm system (alerting devices, manual call points with smoke & heat detectors) will remain fully operational & will signal the presence of a fire to the Fire Service.
If a fire is discovered, please use the nearest Manual Call Point & follow normal evacuation procedures.
No 'Hot Works' are to be undertaken during the period of the sprinkler isolation unless for emergency reasons & with the appropriate safety measures in place.
To enquire about this essentail work, please contact the undersigned.

Contact:
Craig Connor
Senior Compliance Technician
Property & Campus Development Division
Cellphone: 027 286 1446
Email: craig.connor@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

E213: Parker Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Sprinkler System Isolation

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E209) - Marples Building, 340 Great King Street
(E212) - Benham Building, 346 Great King Street
(E213) - Parker Building, 344 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage:Sprinkler System Isolation

Audience: All Building Users

Description:
Contractors will be moving & altering the sprinkler system valve set to enable the demolition of the Zoology Annexe.
This work is programmed for the week of 28th September to 2nd October 2026 & will involve the isolation of the sprinkler system for the duration of the work.
The isolation will affect the sprinkler systems in E209 - Marples, E212 - Benham & E213 - Parker buildings.
During the isolation these building's sprinkler systems will be inopperative & will not signal a fire to the Fire Service.
The Fire Alarm system (alerting devices, manual call points with smoke & heat detectors) will remain fully operational & will signal the presence of a fire to the Fire Service.
If a fire is discovered, please use the nearest Manual Call Point & follow normal evacuation procedures.
No 'Hot Works' are to be undertaken during the period of the sprinkler isolation unless for emergency reasons & with the appropriate safety measures in place.
To enquire about this essentail work, please contact the undersigned.

Contact:
Craig Connor
Senior Compliance Technician
Property & Campus Development Division
Cellphone: 027 286 1446
Email: craig.connor@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

E214: Dental Clinical Services Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

E305: Physiotherapy Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

E325: Eccles Building

Demolition of the Zoology Annex 14 September to 13 November 2026

14 Sep 2026 07:30 - 13 Nov 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E209) - Marples Building, 340 Great King Street
(E213) - Parker Building, 344 Great King Street
(E212) - Benham Building, 346 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 14-09-2026 07:30 to 13-11-2026 17:00

Scheduled Outage: Demolition of the Zoology Annex 14 September to 13 November 2026

Audience: To all users of the buildings listed above

Description: The former Zoology Annex, located between the Marples Building and the Dental School has been vacant for some time and is no longer fit for purpose. As part of our ongoing campus planning and space optimisation work under the Pae Tata Strategic Plan, the building will be demolished.

Enabling works are now underway and will continue through to early September. Demolition is expected to begin from mid-September. The demolition and associated remediation of the site is expected to take two months.

Property and Campus Development will be working closely with neighbouring departments to minimise disruption.

More detailed information about the works and what to expect will be shared with affected areas as plans are finalised.


Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cellphone: 021 279 8022
Email: wes.jenkins@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

28 Sep 2026 07:30 - 02 Oct 2026 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 02-10-2026 17:00

Scheduled Disruption: Hydrovac and cutting equipment noise in the Marples car park, 28 September to 2 October 2026

Audience: Users of the buildings listed above

Description: From Monday 28th September Wormald will be undertaking some sprinkler valve system modifications to allow for the Zoology Annex demolition.
Contractors will be using a hydrovac and some cutting equipment in the Marples car park, creating some noise on and off, over the week.
For further information please contact Project Manager Jamie Cargill, 021 336 534

Contact: Operations Hub Co-Ordinators
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshubs@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Scheduled disruption: Zoology Annex Demolition works

28 Sep 2026 07:30 - 31 Jan 2027 17:00

(E214) - Dental Clinical Services Building, 324 Great King Street
(E207) - Zoology Annexe, 326 Great King Street
(E208) - Zoology Annexe - Goods Store, 470 George Street
(E209) - Marples Building, 340 Great King Street
(E325) - Eccles Building, 309 Great King Street
(E305) - Physiotherapy Building, 325 Great King Street

Timeframe: 28-09-2026 07:30 to 31-01-2027 17:00

Scheduled disruption: Zoology Annex Demolition works.

Audience: users of buildings listed above

Description:
Enabling works for the planned demolition of the former Zoology Annex, located between the Marples Building and the Dental School, are underway and expected to continue through to November. Demolition and associated remediation of the site is expected to begin in late November and take two months.

Stage 1: Enabling Works (September to November)
• Asbestos removal works will begin on 28 September and continue through to late November, undertaken by licensed contractors in accordance with the Health and Safety at Work (Asbestos) Regulations 2016.
• Independent air monitoring and additional filtration measures will be in place throughout the works.
• The Annex car park will be closed from 28 September until demolition is complete.
• From mid-November, occupants may notice contractors wearing PPE externally during soffit removal, this is an occupational requirement and is not indicative of any health and safety risk to staff or students.
• ACM waste will be removed from site as required between 6:00am and 6:30am to minimise disruption.
• Fire valve relocation works will occur between 28 September and 9 October, involving excavation, concrete cutting, and some associated noise and dust.

Stage 2: Demolition
• Building demolition is currently scheduled to commence from 23 November 2026.
• Some temporary pedestrian access changes will be required, including restrictions to routes near the Dental Building.
• A detailed demolition and traffic management plan is being developed, and a further update will be provided before demolition begins.

Property and Campus Development will continue to work closely with neighbouring departments to minimise disruption.

Thank you for your patience while these works are undertaken. Please share this information with your teams as appropriate.

Contact: Wes Jenkins
Head of Capital Works
Property & Campus Development Division
Cell phone: 021 279 8022
Email: wes.jenkins@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

F505: Richardson Building

Ceiling repair

21 Sep 2026 12:00 - 08 Oct 2026 17:00

(F505) - Richardson Building, 85 Albany Street

Timeframe: 21-09-2026 12:00 to 08-10-2026 17:00

Scheduled Outage:

Audience:

Description:Repair work will be taking place under the curved area on the Eastenn side of the Te Tumu Building.This is to repair the damage caused by a truck colliding with the ceiling.
A mobile scaffold will be going up as well as security cages to isolate the work area.No exit or entry points will be affected to Castle theatres or ground floor Te Tumu.
Distruptive noise will be kept to a minimum when possible as to close proximity to teaching areas

Contact:
Matthew Ngawati
Team Leader- Building Services
Property Services Division
Phone: 556 5547
Cellphone: 021 279 8031
Email: matthew.ngawati@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F507: Annie Stevenson Building

Gutter clean and roof repairs

30 Sep 2026 07:00 - 30 Sep 2026 17:00

(F507) - Annie Stevenson Building, 89 Union Place East
(F508) - Archway Lecture Theatres, 290 Leith Walk
(G507) - Archway Building, 90 Union Place East

Timeframe: 30-09-2026 07:00 to 30-09-2026 17:00

Scheduled Outage:

Audience:

Description:Contractors will be undertaking Gutter cleaning and roof repairs on the Annie Stevenson building on the 30 of September they will be using a crane parked on the north side of the building to access the roof areas works will begin at 7am and continue until complete. there maybe some access restrictions during this period but all emergency egress points will be available.
A ground safety crew and cones and barriers will be in place.


Contact:
Jeff Burrow
Team Leader Plumbing and Gas
Property Services Division
Phone: 556 5208
Cellphone: +6421 279 0353
Email: jeff.burrow@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F508: Archway Lecture Theatres

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

Gutter clean and roof repairs

30 Sep 2026 07:00 - 30 Sep 2026 17:00

(F507) - Annie Stevenson Building, 89 Union Place East
(F508) - Archway Lecture Theatres, 290 Leith Walk
(G507) - Archway Building, 90 Union Place East

Timeframe: 30-09-2026 07:00 to 30-09-2026 17:00

Scheduled Outage:

Audience:

Description:Contractors will be undertaking Gutter cleaning and roof repairs on the Annie Stevenson building on the 30 of September they will be using a crane parked on the north side of the building to access the roof areas works will begin at 7am and continue until complete. there maybe some access restrictions during this period but all emergency egress points will be available.
A ground safety crew and cones and barriers will be in place.


Contact:
Jeff Burrow
Team Leader Plumbing and Gas
Property Services Division
Phone: 556 5208
Cellphone: +6421 279 0353
Email: jeff.burrow@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F509: Gregory Building

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F512: 270 Leith Walk

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F522: Leith 2

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F523: Leith 3

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F608: Psychology Annexe

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F611: 93 Union Street - Psychology

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F621: Laboratory Annexe - Psychology

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

F622: William James Building

Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

24 Sep 2026 07:30 - 02 Oct 2026 17:00

(F523) - Leith 3, Leith Walk
(F522) - Leith 2, Leith Walk
(F512) - 270 Leith Walk, 270 Leith Walk
(F509) - Gregory Building, 276 Leith Walk
(F508) - Archway Lecture Theatres, 290 Leith Walk
(F622) - William James Building, 275 Leith Walk
(F608) - Psychology Annexe, 285 Leith Walk
(F611) - 93 Union Street - Psychology, 93 Union Place East
(F621) - Laboratory Annexe - Psychology, 291 Leith Walk

Timeframe: 24-09-2026 07:30 to 02-10-2026 17:00

Scheduled Outage: Leith Walk Improvements - Installation of bollards 24 September to 2 October 2026

Audience: All users of the buildings listed above

Description: There will be some further minor disruption, while work continues to be undertaken on the excavation of the holes and pouring of the concrete for the installation of the bollards between the Leith 2 Building and Leith 3 Building. Pedestrian and bike access will still be accessible at all times.

Please note that as of 6 October, Leith Walk will no longer be accessible by vehicles.

Contact: Operations Hub Coordinator
Property & Campus Development Division
Phone: 03 479 8003
Email: operationshub@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

G405: Science 3

Shelving install

29 Sep 2026 07:30 - 30 Sep 2026 17:00

(G405) - Science 3, 730 Cumberland Street

Timeframe: 29-09-2026 07:30 to 30-09-2026 17:00

Scheduled Outage:

Audience:

Description: The Dexion shelving will be going into the room on the 6th floor at the top of the North ,East stairwell,from Tuesday the 29/9/26.
There will be some concrete drilling that will occur first thing in the mornings when need be.noise kept to a minimum
The stairwell will not be affected at any time for Emergency procedures.
Dexion will be using the Eastern ground floor loading bay for deliveries and on site parking in a approved parking space for the duration

Contact:
Matthew Ngawati
Team Leader- Building Services
Property Services Division
Phone: 556 5547
Cellphone: 021 279 8031
Email: matthew.ngawati@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

G413: Science 2

Concrete drilling

30 Sep 2026 06:00 - 30 Sep 2026 08:00

(G413) - Science 2, 70 Union Place West

Timeframe: 30-09-2026 06:00 to 30-09-2026 08:00

Scheduled Outage:

Audience:

Description: There will be concrete drilling happening from 6 am on wednesday 30th September in the north stairwell.
This is to secure the loose stair nosings. The stair well will still be a open emergency exit during these repairs

Contact:
Matthew Ngawati
Team Leader- Building Services
Property Services Division
Phone: 556 5547
Cellphone: 021 279 8031
Email: matthew.ngawati@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

G502: Clocktower

Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

29 Sep 2026 10:00 - 30 Sep 2026 18:00

(G502) - Clocktower, 362 Leith Street
(G505) - Geology Building, 360 Leith Street
(J940) - Vice-Chancellor's Residence, 50 St Leonards Drive

Timeframe: 29-09-2026 10:00 to 30-09-2026 18:00

Scheduled Outage:
Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

Audience:
Campus Watch
Facility Managers
Building Occupants
Trades Team Leaders
Trades Grounds


Description:
Contractors will be operating a remotely piloted aircraft over the Clocktower, Geology and VC's Residence buildings between 10:00 and 18:00 on Tuesday September 29 for the purposes of roof inspections.

A contingency day of Wednesday September 30 is available to the contractor.



Contact:
Rob Wilks
Assc. Dir. Property Operations
Property Services Division
Phone: 471 6218
Cellphone: 021 803 953
Email: rob.wilks@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

G505: Geology Building

Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

29 Sep 2026 10:00 - 30 Sep 2026 18:00

(G502) - Clocktower, 362 Leith Street
(G505) - Geology Building, 360 Leith Street
(J940) - Vice-Chancellor's Residence, 50 St Leonards Drive

Timeframe: 29-09-2026 10:00 to 30-09-2026 18:00

Scheduled Outage:
Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

Audience:
Campus Watch
Facility Managers
Building Occupants
Trades Team Leaders
Trades Grounds


Description:
Contractors will be operating a remotely piloted aircraft over the Clocktower, Geology and VC's Residence buildings between 10:00 and 18:00 on Tuesday September 29 for the purposes of roof inspections.

A contingency day of Wednesday September 30 is available to the contractor.



Contact:
Rob Wilks
Assc. Dir. Property Operations
Property Services Division
Phone: 471 6218
Cellphone: 021 803 953
Email: rob.wilks@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.

G507: Archway Building

Gutter clean and roof repairs

30 Sep 2026 07:00 - 30 Sep 2026 17:00

(F507) - Annie Stevenson Building, 89 Union Place East
(F508) - Archway Lecture Theatres, 290 Leith Walk
(G507) - Archway Building, 90 Union Place East

Timeframe: 30-09-2026 07:00 to 30-09-2026 17:00

Scheduled Outage:

Audience:

Description:Contractors will be undertaking Gutter cleaning and roof repairs on the Annie Stevenson building on the 30 of September they will be using a crane parked on the north side of the building to access the roof areas works will begin at 7am and continue until complete. there maybe some access restrictions during this period but all emergency egress points will be available.
A ground safety crew and cones and barriers will be in place.


Contact:
Jeff Burrow
Team Leader Plumbing and Gas
Property Services Division
Phone: 556 5208
Cellphone: +6421 279 0353
Email: jeff.burrow@otago.ac.nz


Please advise those people affected. We apologise for any inconvenience.

J940: Vice-Chancellor's Residence

Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

29 Sep 2026 10:00 - 30 Sep 2026 18:00

(G502) - Clocktower, 362 Leith Street
(G505) - Geology Building, 360 Leith Street
(J940) - Vice-Chancellor's Residence, 50 St Leonards Drive

Timeframe: 29-09-2026 10:00 to 30-09-2026 18:00

Scheduled Outage:
Remotely Piloted Aircraft (Drone) Flight Operations Notification – Roof Inspection

Audience:
Campus Watch
Facility Managers
Building Occupants
Trades Team Leaders
Trades Grounds


Description:
Contractors will be operating a remotely piloted aircraft over the Clocktower, Geology and VC's Residence buildings between 10:00 and 18:00 on Tuesday September 29 for the purposes of roof inspections.

A contingency day of Wednesday September 30 is available to the contractor.



Contact:
Rob Wilks
Assc. Dir. Property Operations
Property Services Division
Phone: 471 6218
Cellphone: 021 803 953
Email: rob.wilks@otago.ac.nz



Please advise those people affected. We apologise for any inconvenience.